Discuss advanced technologies and project scheduling software to make project successful!
Software for project planning:
In
this modern age, in order to make any project successful within a limited
deadline, project managers need
to take the
help of different
advanced technologies and
project scheduling software. With
the help of the project, planning software managing and scheduling the projects
can be easier (Taghipour et al. 2020).
Some of the project planning software are described below. With the help of a stacked chart, team members and project
managers can see when projects have started, finished, and reached the
milestones.
Gantt
chart:
A
“Gantt chart” represents project tasks
visually using a bar graph that spans the duration of the projects (Robles, 2018). A Gantt chart
displays the work planned for each day when a project is planned. This type of
chart consists of vertical bar graphs displaying project tasks and horizontal
ones displaying task durations (Armenia et al. 2019).
Critical
path method:
Methods
such as the critical path method (CPM) and critical path analysis (CMA)
determine the degree of scheduling
flexibility required to
complete projects. The
critical path in
project management refers to the longest sequence of tasks that needs to
be completed on time to ensure the completion of the whole project. If
important activities are not completed on time, the rest of the project will be delayed. CPM includes
finding the most critical activities, estimating task durations, and figuring
out task dependencies. The flexibility of a project can be better understood
when large projects are broken down into smaller jobs. Slack, or flexibility,
is the degree to
which a particular work can accommodate a change in the environment. It demonstrates
how much time can be added to the
work without affecting
others or the project's due date.
In the
OSC project, the
Critical path method
can play an
important role in prioritizing the important
task and breaking a long task into small flexible tasks. This method
allows the projects to be fined within
the limited deadlines. The scalability of the project can be determined by the
float. In the event of project risks or unforeseen challenges, the float needs
to be utilized.
PERT
chart:
PERT
charts provide a visual representation of a project's timetable when used in project management.
The “Program Evaluation
Review Technique (PERT)”
makes it possible to review
individual tasks within a
project. In the management of tasks, some project managers prefer the PERT
or Gantt chart for its task dependencies and easy-to-understand features (Evdokimov et al. 2018). A PERT
chart is used by the project manager to estimate
the time required to complete each task. In this way, the project can be budgeted
and resources allocated in order to
ensure its success. The nodes in a PERT
diagram represent project events or
milestones.
In
the case of OSC projects, the PERT chart can be used to schedule tasks,
prioritize the tasks, and budgeting and resource allocation can be
done with the help
of the PERT chart.
WBS:
“Work Breakdown
Structures (WBS)” are
hierarchical systems used
to organize a project's activities. A WBS is used to
divide the project deliverables into manageable pieces. Depending on specific
circumstances, subtasks may need to be allocated to each deliverable during the
assigning of a job or set of tasks. Large, complex projects can be broken down
into smaller, more manageable tasks, which are then assigned to individuals or teams.
Stakeholders
Roadmap:
A
project needs to have a clear road map with specific goals and objectives that
are not changed after the initial phases
are completed in order to be successful. Each respective stakeholder's
requirements need to be outlined throughout the planning phase of the project,
including those who will benefit from the project's outcome (Schelly et al.
2019). However, it can be a mistake to assume that the stakeholder’s goals and
demands are obvious to the project. Therefore, before developing the synergies,
the project manager needs to talk with the team and learn everything about the
project and the capabilities of the stakeholders.
Deliverables
list:
It
is important to compile a list of all
deliverables and each deliverables news to be assigned to the team members with
a calculated deadline. The project also needs to ensure that every created deliverable bead is
documented and explains the approval procedures (LEE, 2022). The internal approval procedure also needs
to be understood by the project manager in order to avoid delays in the project.